asbestos demolition survey Sedgley

Asbestos Demolition Survey in Sedgley

Enquire Today For A Free No Obligation Quote

At Asbestos Demolition Survey, we carry out fully compliant R&D asbestos surveys for properties scheduled for full or partial demolition in Sedgley and across the UK. Whether you’re a contractor, property manager, or developer, we ensure your site complies with the Control of Asbestos Regulations (CAR 2012) before any structural work begins.

Every demolition survey Asbestos Demolition Survey undertake is tailored to the building’s structure and demolition plans, involving intrusive inspection methods, laboratory analysis, and clear reporting that supports safe dismantling and waste handling.

Why Is an Asbestos Demolition Survey Required Before Demolition in Sedgley?

In Sedgley, an asbestos demolition survey is legally required before any demolition work that may disturb asbestos-containing materials (ACMs) within the fabric of the building.

The main purpose is to locate and assess all asbestos in Sedgley that could be disturbed during demolition so it can be safely removed or managed before work starts. For structures built before 2000, this survey is essential for protecting workers and meeting statutory duty-of-care requirements.

What Should You Expect From the Survey Report Following an Inspection in Sedgley?

Our R&D asbestos demolition survey reports in Sedgley include:

  • Location and condition of identified ACMs – Detailed records of asbestos-containing materials found on-site.
  • Annotated building plans – Clear diagrams showing exact ACM locations.
  • Photographic evidence – Images supporting survey findings.
  • Risk categorisation – Assessment of potential hazards linked to each ACM.
  • Recommendations – Guidance for safe removal before demolition.
  • Restricted access notes – Areas where inspection was limited or further investigation is required.
  • Fast-tracked reporting – Reports delivered within 48 hours for urgent projects.

How Much Does an Asbestos Demolition Survey Cost in or Around Sedgley?

The cost of an asbestos demolition survey in Sedgley ranges from £300 to over £900, depending on the size, complexity, and structure of the building.

Prices are influenced by the number of areas to be surveyed, accessibility, and whether the property is residential, industrial, or commercial. Additional cost considerations include the urgency of the inspection and requests for same-day or next-day service.

Contact Asbestos Demolition Survey in West Midlands to get customised prices for your property.

When Is an R&D (Refurbishment and Demolition) Survey Mandatory Across Sedgley?

An R&D asbestos demolition survey is legally required in Sedgley before any part of a building’s structure is altered, dismantled, or removed, including load-bearing walls, roof structures, floors, and service areas.

Under the Control of Asbestos Regulations 2012 and the CDM 2015 framework, duty holders in Sedgley must arrange this survey before work starts to prevent delays, stop notices, or HSE enforcement action.

What’s the Difference Between a Management Survey and a Demolition Survey?

An asbestos demolition survey is intrusive and comprehensive, targeting all areas in Sedgley where asbestos could be disturbed or damaged during demolition. In contrast, an asbestos management survey is non-intrusive and intended for identifying potential asbestos risks during normal building use.

For demolition projects in Sedgley, a management survey alone is not sufficient; a demolition survey must be completed in advance of any work starting on-site.

Can Surveys in Sedgley Be Carried Out Quickly Before Scheduled Demolition Work?

Our asbestos demolition surveyors in Sedgley can often attend at short notice and offer same-day or next-day appointments where timescales are critical.

We provide fast-track laboratory testing and can issue full reports within 24 to 48 hours, allowing demolition contractors and project managers in Sedgley to keep projects on schedule.

How Do Surveyors in Sedgley Ensure Compliance With HSE Regulations and CDM 2015?

All asbestos demolition surveys in Sedgley are carried out by BOHS P402-qualified surveyors in accordance with HSG264 guidance, ensuring inspections meet the required legal and technical standards.

For projects in Sedgley under the Construction (Design and Management) Regulations 2015, our reports also provide clearly marked ACM locations, safe removal recommendations, and risk ratings.

What Areas of a Property Are Inspected During an Asbestos R&D Survey Near Sedgley?

We survey for asbestos in all areas of a property in Sedgley that could be impacted by demolition works, including:

  • Internal walls – Checked for asbestos-containing materials within plaster, panels, or insulation.
  • Ceilings – Inspected for textured coatings, tiles, or asbestos insulation boards.
  • Floor voids – Accessed to examine subfloor structures and coverings.
  • Pipe ducts – Checked for asbestos insulation, gaskets, or lagging.
  • Lift shafts – Inspected for asbestos-containing panels or lining materials.
  • Loft spaces – Examined for insulation, boards, or cement products.
  • Risers – Checked for pipe insulation or lining boards.
  • Exterior panels or soffits – Inspected for asbestos cement or cladding materials.

Do Survey Providers in Sedgley Also Offer Asbestos Removal or Remediation Services?

While our primary focus is asbestos demolition surveying, we work with licensed asbestos removal specialists in Sedgley and can recommend suitable contractors for remediation.

This enables a seamless transition from survey to safe asbestos removal before demolition begins. We can also oversee clearance checks or re-inspections after removal to provide full compliance sign-off.

Contact Asbestos Demolition Survey in Sedgley for a consultation to arrange a survey for your property.

Find More Info

Make sure you contact us today for a number of great asbestos demolition survey services in Sedgley.

For more information on asbestos demolition survey in Sedgley DY3 1, fill in the contact form below to receive a free quote today.

★★★★★

“When planning the demolition of an old warehouse in Sheffield, we needed an asbestos demolition survey carried out urgently. Asbestos Demolition Survey attended the next day, completed a thorough inspection, and had the report ready within 48 hours. His attention to detail and clear guidance ensured our team could proceed without any compliance concerns.”


Leonard Havers

West Midlands

★★★★★

“Our demolition project in Cardiff was on a tight schedule, the Asbestos Demolition Survey was outstanding. She identified every potential asbestos risk, explained the implications in plain terms, and coordinated the report so work could continue without delay. The professionalism and efficiency were second to none.”


Harriet Langford

West Midlands

Get In Touch

About Us Asbestos Demolition Survey

We specialise in providing high-quality Asbestos Demolition Survey, ensuring we offer the best service in the UK.